PERENCANAAN BANGUNAN PENAHAN SEDIMEN (CHECKDAM III) DI DAERAH ALIRAN SUNGAI CILIMAN DESA PARAKANLIMA KECAMATAN CIRINTEN KABUPATEN LEBAK

  • Gunawan Noor Universitas Banten Jaya
  • Euis Amelia Universitas Banten Jaya
  • Dimas Bayu Universitas Banten Jaya
Keywords: Chekdam, Land carrying capacity, Debit design, Sedimentation, Dam stability

Abstract

 

The river is a source of water that holds and flows water and material that it carries from upstream. The problem that often occurs in upstream areas is erosion problems which cause sedimentation. The objectives of this study are: to determine the amount of sediment rate (Qs) and to find out the full time of the water river checkpoint. So it needs to be reviewed by analyzing the stability of sediment-retaining weirs using a flood period of fifty years (O50), with a design debit of 255.694 m3

/ second, this study was also conducted to determine whether the stability of sediment-retaining weirs is safe against forces with flood discharge (Q25), with a design debit of 237.692 m3 / second. The style calculated by himself is gravity, earthquake force, uplift pressure, pressure on water. The weir stability analysis that is taken into account is the dimensions of the weir safe against eccentricity, soil carrying capacity, bolster force, shear force, and force acting on normal water level conditions and flood water levels. The location of this study was carried out in the Watershed (DAS) Air Ciliman Cirinten District, Lebak Regency.

References

Christadi, Hary, 2002, Mekanika Tanah I, Gadjah Mada Univerity Press, Yogyakarta.
___________, 2002, Mekanika Tanah II, Gadjah Mada Univerity Press, Yogyakarta.
____________, 2010, Analisis dan Perancangan Fondasi Bagian I, Gadjah Mada Univerity Press, Yogyakarta.
Direktorat Jendral Pengairan, 1986, Standar Perencanaan Irigasi Bagian Bangunan Utama : (KP-02) Departemen Pekerjaan Umum, CV Galang Persada, Bandung.
Direktorat Jendral Pengairan, 1986, Standar Perencanaan Irigasi Bagian Parameter Bangunan : (KP-06) Departemen Pekerjaan Umum, CV Galang Persada, Bandung.
Direktorat Jendral Pengairan, 1986, Standar Perencanaan Irigasi Bagian Standar Penggambaran : (KP-07) Departemen Pekerjaan Umum, CV Galang Persada, Bandung.
Departemen Pekerjaan Umum, 1991, Standar Tata Cara Perencanaan Teknik Bendung Penahan Sedimen SK SNI T – 19 – 1991 – 03, Yayasan Badan Penerbit Pekerjaan Umum, Jakarta.
Departemen Pekerjaan Umum, 1990, Standar Tata Cara Perencanaan Umum bendung SK SNI T – 02 – 1991 – F, Yayasan Badan Penerbit Pekerjaan Umum, Jakarta.
Dwi Sadi, Rino, 2016, Kaji Ulang Bendung Penahan Sedimen Waduk Karian, FT UNTIRTA, Cilegon.
Mulyadi, Udi, 2017, Kaji Ulang Perencanaan Bendung Penahan Sedimen (Checkdam II) di Hulu Waduk Karian Desa Cipanas Kabupaten Lebak, FT UNBAJA, Serang.
Soedarsono, 1998, Tugas Dasar Perencanaan Bendung, Teknik Sipil Politeknik PU – Politeknik ITB, Bandung.
Soedarsono, 2006, Irigasi dan Bangunan Air : Dasar – dasar Perencanaan Bendung Tetap, Diktat Kuliah S-1 Jurusan Teknik Sipil, UNBAJA, Serang.
Soedarsono, 1972, Perhitungan Bendung Tetap, Dirjen Pengairan, Bandung.
Published
2019-02-25
How to Cite
Noor, G., Amelia, E., & Bayu, D. (2019). PERENCANAAN BANGUNAN PENAHAN SEDIMEN (CHECKDAM III) DI DAERAH ALIRAN SUNGAI CILIMAN DESA PARAKANLIMA KECAMATAN CIRINTEN KABUPATEN LEBAK. Journal of Sustainable Civil Engineering (JOSCE), 1(1), 74-90. Retrieved from https://ejournal.lppm-unbaja.ac.id/index.php/josce/article/view/561

Most read articles by the same author(s)