OPTIMASI BIAYA PRODUKSI PADA PT. XYZ DENGAN PENGENDALIAN PERSEDIAAN BAHAN BAKU SODIUM TRYPOLYPHATE

  • Arif Budi Sulistyo Universitas Banten Jaya
  • Toha Ikhsan Universitas Banten Jaya
  • Pugy Gautama Universitas Banten Jaya
Keywords: Economic Order Quantity (EOQ), Just In Time (JIT), Biaya Persediaan, Sodium Tripolyphate

Abstract

This study aims to compare the Economic Order Quantity and Just In Time inventory methods to determine which inventory management strategy is best for PT XYZ. Observation, documentation, and interviews are the data collection methods used in this study. EOQ Formula, Safety Stock, Reorder Point, and Just In Time Formula are the data analysis techniques used in this study. The findings show that the component cost of raw material inventory using the EOQ method, storage costs IDR 2,312/order, and total inventory costs IDR 16,775,553. The JIT method reveals that the total cost of inventory is IDR 1,798,711. An inventory system with JIT that only has an inventory cost of 1,798,711 can reduce costs by about 43% more effectively, according to JIT and EOQ studies. The findings show that the component cost of raw material inventory using the EOQ method, storage costs IDR 2,312/order, and total inventory costs IDR 16,775,553. The JIT method reveals that the total cost of inventory is IDR 1,798,711. An inventory system with JIT that only has an inventory cost of 1,798,711 can reduce costs by about 43% more effectively, according to JIT and EOQ studies.

References

Assauri, S. (2016). Manajemen Operasi Produksi. Rajawali Press.

Dwiyanti, D. (2022). Aplikasi metode Material Requirement Planning ( MRP ) pada CV . Kana permadi dalam merencanakan kebutuhan bahan baku. 4(8), 3744–3754.

Fahmi, I. (2016). Manajemen Produksi Dan Operasi. Alfabeta.

Fian Mahendra, A., Jufriyanto, M., & Rizqi, A. W. (2022). Pengendalian Persediaan Bahan Baku Singkong dengan Metode EOQ (Studi kasus di UMKM Kuncoro Gresik). Serambi Engineering, VII(3).

Ginting, R. (2017). Sistem Produksi. Graha Ilmu.

Gunawan, I. N. D., & Setiawan, P. Y. (2022). Inventory Management with EOQ Method at “Nitra Jaya” Fashion-Making Company in Badung. European Journal of Business and Management Research, 7(3), 347–351. https://doi.org/10.24018/ejbmr.2022.7.3.1444

Hencha, R., & Verma, D. S. (2019). Study of material requirement planning processes and its analysis and implementation a case study of automobile industry. International Journal of Scientific and Technology Research, 8(8), 648–653.

Herjanto, E. (2018). Manajemen Produksi dan Operasi. PT. Grasindo.

Nurmutia, S. (2020). Perencanan Material Produk Sandal Dengan Metode Material Requirement Planning (Mrp). JITMI (Jurnal Ilmiah Teknik Dan Manajemen Industri), 3(1), 59. https://doi.org/10.32493/jitmi.v3i1.y2020.p59-65

Oktarini, D., & Agustiningrum, M. (n.d.). Analisis Perbandingan Pengendalian Persediaan Sparepart Dengan Metode Tradisional Dan Just In Time Dalam Upaya Mengurangi Pemborosan. http://jurnal.um-palembang.ac.id/integrasi/index

Resista Vikaliana, Yayan Sofian, Novi Solihati, Dimas Bayu Adji, & Saskia Suci Maulia. (2020). Manajemen Persediaan (1st ed., Vol. 1). Media Sains Indonesia.

Riyanto, B. (1993). Dasar-Dasar Pembelanjaan Perusahaan (1st ed., Vol. 1). UGM Press.

Sulistyo, A. B. (2022). Perencanaan Line Balancing Proses Produksi Pada Shearing Line Plant Dengan Menggunakan Metode Rank Position Weight. Jurnal PASTI (Penelitian Dan Aplikasi Sistem Dan Teknik Industri), 16(1), 49. https://doi.org/10.22441/pasti.2022.v16i1.005

Sunardi, N. (2018). Manajemen Produksi dan Operasi. Unpam Press.

Published
2023-06-22
How to Cite
Sulistyo, A. B., Ikhsan, T., & Gautama, P. (2023). OPTIMASI BIAYA PRODUKSI PADA PT. XYZ DENGAN PENGENDALIAN PERSEDIAAN BAHAN BAKU SODIUM TRYPOLYPHATE. Jurnal Intent: Jurnal Industri Dan Teknologi Terpadu, 6(1), 14 - 23. https://doi.org/10.47080/intent.v6i1.2591
Section
Articles

Most read articles by the same author(s)