EVALUASI PELAKSANAAN PEMBANGUNAN RUANG KELAS BARU SMK NEGERI 1 TUNJUNG TEJA DENGAN EARNED VALUE ANALISYS

  • Firdaus Firdaus Student
  • Rosdiyani Rosdiyani Universitas Banten Jaya
  • Ma’ulfi Kharis Abadi Universitas Banten Jaya
Keywords: Earned Value Analysis, Perfomance, Project

Abstract

In running a construction project, good management is needed so that the work is carried out on time. Project success is strongly influenced by cost, quality, and time factors. Two important factors that must be considered are cost and time. Project control can be done by applying the Earned Value Analysis method to both aspects. This study aims to evaluate the implementation of the construction of new classrooms at SMK Negeri 1 Tunjungteja. This evaluation is important to assess the extent to which the project is running according to plan in terms of cost, time, and results achieved. EVA methodology was applied to measure project performance. Data was collected from project reports, work schedules, and budgets that had been prepared where the data used was data for the period from week 1 to week 21. The results showed that in week 1 to 21 the SV value was known to be the highest ratio in the week 13 period. Then the SV value in the 1st period to the 21st period found a negative value. For the SPI value, it has a value <1 in the 1st to 21st period except in week 16. After that, it is known that the ETS and EAS values are 0 in the 21st period with a duration of 21 weeks, which means that the work is not in accordance with what has been planned on the job.

References

Agustin, C. E. Analisis Probabilitas Ketepatan Biaya dan Waktu dengan Metode Monte Carlo pada Konsep

Nilai Hasil (Earned Value) untuk Proyek Jalan (Studi Kasus: Paket Rekontruksi dan Pelebaran Jalan Bts.

Kota Bojonegoro-Pajeng Sta 28+ 230–32+ 230).

Arifin, Zainal. (2022). Pengantar Manajemen Proyek.

Christina, W. Y., Djakfar, L., & Thoyib, A. (2012). Pengaruh Budaya Keselamatan Dan Kesehatan Kerja (K3)

terhadap kinerja proyek konstruksi. RekayasaSipil, 6(1), 83-95.

Hosaini, H., dkk. (2021). Manajemen Proyek. Bandung : Widia Bhakti Persada

Imam, Soeharto. (1995). Manajemen Proyek Dari Konseptual Sampai Operasional. Jakarta: Erlangga.

Kerzner, H. (2002). Strategic planning for project management using a project Management maturity model.

John Wiley & Sons.

Priyo, M. (2012). Metode Earned Value Pada Jasa Konstruksi. Jurusan Teknik Sipil Universitas

Muhammadiyah. Yogyakarta.

Proaño-Narváez, M., Flores-Vázquez, C., Vásquez Quiroz, P., & Avila-Calle, M. (2022). Earned value method

(EVM) for construction projects: current Application and future projections. Buildings, 12(3), 301.

Santoso, J. T. (2023). Pengantar Manajemen Proyek Teknologi Informasi. Penerbit Yayasan Prima Agus

Teknik, 1-129.

Soemardi, B. W., Wirahadikusumah, R. D., & Abduh, M. (2006). Pengembangan Sistem Earned Value untuk

pengelolaan proyek konstruksi di Indonesia. Laporan Hasil Riset, ITB.

Rosmawati, Siti. (2024). Analisis Kinerja Waktu Pelaksanaan Pembangunan Gedung Di Sekolah Menengah

Kejuruan Negeri (SMKN) 1 Puloampel Serang.

Published
2024-10-15
How to Cite
Firdaus, F., Rosdiyani, R., & Abadi, M. (2024). EVALUASI PELAKSANAAN PEMBANGUNAN RUANG KELAS BARU SMK NEGERI 1 TUNJUNG TEJA DENGAN EARNED VALUE ANALISYS. Journal of Sustainable Civil Engineering (JOSCE), 6(02), 114-127. https://doi.org/10.47080/josce.v6i02.3524