PENERAPAN METODE STOPWATCH TIME STUDY UNTUK MENENTUKAN WAKTU BAKU PADA PROSES PERAKITAN TAMIYA
(Studi kasus di Laboratorium Ergonomi Universitas Serang Raya)
DOI:
https://doi.org/10.47080/dac06f23Keywords:
Work Design Analysis, Efficient, Laboratory, Assembly, TamiyaAbstract
Tamiya assembly standard time measurement research was conducted at the Ergonomics Laboratory of Serang Raya University. The main objective of this study is to determine the standard time required in each work element, and identify inefficient activities so that the assembly process can be optimized. Data collection is done through direct observation by measuring the time of each work element of the Tamiya car assembly directly. The research method uses the Stopwatch Time Study method to analyze work time in the Tamiya car assembly process based on a 95% confidence level and a 5% accuracy level. In assembling Tamiya, there are 5 work elements with standard time in the work element of installing wheels and gears, (44.96 seconds), installing tires and connecting gears, (22.83 seconds), installing switches, (22.8 seconds), installing dinamos, (27.75 seconds), installing batteries and bodies, (23.31 seconds). So that the measurement of the standard time for assembling Tamiya at the Ergonomics Laboratory of the University of Serang Raya in the Work Design Analysis practicum is 151.13 seconds. The results of the study are expected to be a reference in the implementation of Work Design Analysis practicum activities.
References
Ainurrohma, S. A., & Retnaningsih, S. M. (2022). Analisis Pengukuran Waktu Kerja di UD. Fish Design Sidoarjo. Jurnal Sains Dan Seni ITS, 11(1), 64-69.
Alfaruqi, W. M. (2019). Pengukuran Waktu Kerja Karyawan Pada Proses Pembuatan Sepatu Di Ud. Putri Diana Jombang. Tugas Akhir, Program Studi Statistik, Fakultas Matematika dan Ilmu Pengetahuan Alam, Institut Teknologi Sepuluh Nopember.
Asarela, S., & Sari, R. P. (2023). Analisis Pengukuran Kerja Menentukan Waktu Baku Menggunakan Metode Jam Henti Terhadap Operator Persiapan Komponen (Studi Kasus: PT XYZ). Jurnal Serambi Engineering, 8(3), 6479–6486.
Cahyani, E., & Indriani, W. (2022). Analisis Pengukuran Dan Standar Waktu Kerja Pada Pelayanan Pembuatan Surat Di Kantor Camat Kecamatan Makarti Jaya (Studi Kasus Kabupaten Banyuasin). Jurnal Kompetitif, 11(1), 80–90.
Gunawan, R., & Wahyudin, W. (2022). Usulan Penentuan Waktu Baku Metode Jam Henti Pada Proses Pengemasan Produk Kangkung Akar 250gr. Jurnal Teknik Industri: Jurnal Hasil Penelitian Dan Karya Ilmiah Dalam Bidang Teknik Industri, 8(2), 223-230.
Masniar, M., Marasabessy, U. R., Astrides, E., Asih Ahistasari, Nur Wahyudien, M. A., & Rachmadhani, M. M. (2023). Analysis of Work Measurement Using the Stopwatch Time Study Method at PTEA. Journal of Industrial System Engineering and Management, 2(1), 23–31.
Nevenda, M., & Wulandari, L. (2023). Analisis Perhitungan Waktu Standart Untuk Menentukan Jumlah Tenaga Kerja Optimal Pada Proses Produksi Pt. Nrz Prima Gasket. Jurnal Sains, Teknik Dan Kemasyarakatan, 1(5), 211–222.
Pradana, A. Y., & Pulansari, F. (2021). Analisis Pengukuran Waktu Kerja Dengan Stopwatch Time Study Untuk Meningkatkan Target Produksi Di Pt. Xyz. Juminten, 2(1), 13–24.
Prayuda, S. (2020). Analisis Pengukuran Kerja Dalam Menentukan Waktu Baku Untuk Meningkatkan Produktivitas Kerja Pada Produksi Kerudung Menggunakan Metode Time Study Pada Ukm Lisna Collection Di Tasikmalaya. Jurnal Mahasiswa Industri Galuh, 1(1), 120–126.
Rahayu, M., & Juhara, S. (2020). Pengukuran Waktu Baku Perakitan Pena Dengan Menggunakan Waktu Jam Henti Saat Praktikum Analisa Perancangan Kerja. Unistek, 7(2), 93–97.
Revita, I., Suharto, A., & Izzudin, A. (2021). Studi Empiris Pengendalian Kualitas Produk Pada Vieyuri Konveksi Empirical Study of Quality Control in Vieyuri Konveksi. Bisnis-Net Jurnal Ekonomi Dan Bisnis, 4(2), 39–49.
Septian, M., & Herwanto, D. (2022). Penentuan target produksi paint roller berdasarkan perhitungan waktu baku menggunakan metode stopwatch time study. Journal Industrial Servicess, 7(2), 206-210.
Sutalaksana, dkk. (2006). Teknik Perancangan Sistem Kerja. Bandung : Institut Teknologi Bandung.
Wahid, A., & Chumaidi, A. (2020). Penentuan Waktu Baku Dengan Metode Stopwatch Time Study Proses Produksi Manifold (UD.Jaya Motor Pasurunan. Journal Knowledge Industrial Engineering (JKIE), 7(2), 54–60.
Wicaksono, B. M. (2018). Analisis Pengukuran Waktu Kerja di PT Meshindo Alloy Wheel Surabaya. Tugas Akhir, Departemen Statistika Bisnis.
Wignjosoebroto, Sritomo. (2008). Ergonomi, Studi Gerak dan Waktu. Jakarta : Guna Widya.
Yudisha, N. (2021). Perhitungan waktu baku menggunakan metode Jam Henti pada proses Bottling. Jurnal VORTEKS, 2(2), 85–90.
Downloads
Published
Issue
Section
License
Copyright (c) 2025 Eka Indah Yuslistyari

This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.