Euis Amilia, E., Fahmi, M. and Hariyanto, B. (2022) “ANALISA PERBANDINGAN WAKTU DAN BIAYA PADA KONTRUKSI FULL PRECAST DAN KONTRUKSI KONVENSIONAL ( STUDI KASUS : RUMAH TINGGAL DUA LANTAI JAKARTA TIMUR )”, Journal of Sustainable Civil Engineering (JOSCE), 4(01), pp. 51-64. doi: 10.47080/josce.v4i01.1824.