[1]
Devari, D., Setiani, N. and Artiani, G. 2024. Optimalisasi Biaya dan Waktu Dengan Menggunakan Least Cost Analysis Pada Proyek Gedung Proklamasi, Jakarta. Journal of Sustainable Civil Engineering (JOSCE). 6, 02 (Oct. 2024), 128-140. DOI:https://doi.org/10.47080/josce.v6i02.3515.