[1]
Abadiyah, S. and Karyo, K. 2021. PENGARUH MEETING PAGI DAN SORE TERHADAP TINGKAT EFEKTIFITAS PEKERJA PADA PROYEK TRANS PARK BINTARO. Journal of Sustainable Civil Engineering (JOSCE). 3, 1 (Feb. 2021), 30-37. DOI:https://doi.org/10.47080/josce.v3i1.1118.