Aprisandi, D. (2018) “ANALISIS BIAYA DAN WAKTU METODE HALF SLAB DALAM PEMBANGUNAN PROYEK KONSTRUKSI”, Jurnal Lingkungan dan Sumberdaya Alam (JURNALIS), 1(1), pp. 51-61. Available at: https://ejournal.lppm-unbaja.ac.id/index.php/jls/article/view/188 (Accessed: 20April2025).