Aprisandi, D. (2018). ANALISIS BIAYA DAN WAKTU METODE HALF SLAB DALAM PEMBANGUNAN PROYEK KONSTRUKSI. Jurnal Lingkungan Dan Sumberdaya Alam (JURNALIS), 1(1), 51-61. Retrieved from https://ejournal.lppm-unbaja.ac.id/index.php/jls/article/view/188