[1]
A. Sulistyo and M. Al Fikri, “ANALISIS OPTIMALISASI WAKTU DAN BIAYA PROYEK KONSTRUKSI MENGGUNAKAN METODE TIME COST TRADE OFF”, Intent, vol. 4, no. 1, pp. 25-40, Jun. 2021.