“ANALISIS OPTIMALISASI WAKTU DAN BIAYA PROYEK KONSTRUKSI MENGGUNAKAN METODE TIME COST TRADE OFF: (STUDI KASUS: PROYEK PEMBANGUNAN JALAN GORDA-BANDUNG)” (2021) Jurnal Intent: Jurnal Industri dan Teknologi Terpadu, 4(1), pp. 25–40. Available at: https://ejournal.lppm-unbaja.ac.id/index.php/intent/article/view/1400 (Accessed: 2 August 2025).