“STRATEGI MENGURANGI PRODUK CACAT PADA PENGECATAN BOILER STEEL STRUCTURE DENGAN METODE SIX SIGMA DI PT. CIGADING HABEAM CENTER” (2020) Jurnal Intent: Jurnal Industri dan Teknologi Terpadu, 3(1), pp. 11–24. doi:10.47080/intent.v3i1.796.