“ANALISIS BIAYA DAN WAKTU METODE HALF SLAB DALAM PEMBANGUNAN PROYEK KONSTRUKSI” (2018) Jurnal Lingkungan dan Sumberdaya Alam (JURNALIS), 1(1), pp. 51–61. Available at: http://ejournal.lppm-unbaja.ac.id/index.php/jls/article/view/188 (Accessed: 23 August 2025).